EVITA
Tech Rehearsal report
| Date | 2-16-11 |
| Start | 6:30 |
| Stop | 10:50 |
| Kids released | |
| Break | 9:16-9:43 |
Director: Cliff Butler
Stage Manager: Jessie Drollette
512.299.2053
Late:
Missing: Paige, Sydney (sick)
Didn't Sign in:
| General We've got a show all! Woot. Started run at 8:18-9:16 Act 2 9:43-10:40ish. |
| Next Rehearsal/Schedule. Thursday February 17, 2011 No more breaking curtain. Show etiquette prevails. I will also unlock the front doors so you can get a good sense of run around timing. Call for actors is 6:30 Ground crew is 6:00 light and spot 7:00 Performance Schedule: (Starting Fri) 6:30 call 6:35warmups 7:00 House opens (you are late if you are not at warm ups!) Sunday 1:00 call 1:05 warmups 1:30 House opens. |
| Set Thicker black on the SR wings side Please replace luan on the turntable with plastic like was used in Sunshine Boys. Painting—Juliet walls need flat black, The circle luan needs to be floor blue (tonight anyhoo :D) can we paint the supports in the gap of the turntable black? |
| Props Need lots of cigars Take lable of coffee thingy |
| Sounds/Lights/Special FX Ron, can we move the snake in the fly so that nick has more room to step? Need to dress light cables Move SM to light booth tomorrow. Do we need to sign dimmer 32 to a channel |
| Costumes |
| Dance |
| Director |
| Music |
| Parents |
| Actors Wait til your about to enter before turning the candles on. Remember places at top of show is lobby for most mourners Ann, if you put a pin curl on either side of your head (around your temple) you could anchor a bobby pin into it for the black and blond wig. Just a thought, If you'd like I could show you. |
| Crew Even if we are not on "spike" with the turntable leave it, A) we don't want to point out our mistake and B) an actor could turn an ankle) (in reverse order of importance) |
| Accident/Incident |
| Quote(s) "avast ye mateys, Jesus will save you" Emi Lea |
No comments:
Post a Comment