Sunday, February 13, 2011

Evita rehearsal report 2/13/11

EVITA

Tech Rehearsal report

 

Date

2-13-11

Start

12:30

Stop

10:00

Kids released

9:00

Break

lots

Director: Cliff Butler

Stage Manager: Jessie Drollette

512.299.2053

 

 

 

Late:

Missing: Sydney (s), Catherine (s)

Didn't Sign in: New sign ups are hung up

General

Really good runs today folks, thanks all for your work, your patience, and your improvements. 

Happy Valentines Day tomorrow and please take care of yourselves!

Act One was 54 min Act two was 55 min

Next Rehearsal/Schedule. 

Tuesday February 14th, 2011 6:30 call  

Run through with tech and costumes

Set

Need to reweight and look at baton 2 add one weight please

2nd step up SL

Need to troubleshoot the coffin.  Perhaps we should lengthen the chains and then just dress them so as not to have to remove the chains at all? Thanks Ron, that works well.

Can we put furniture sliders on the bottoms of the theatre seats?

Need a door and fabric in windows (Casa Rosada as well)

Can we screw the platforms stage left to each other and to floor?

Can we put a lip on edge of platforms so people can feel before they fall?

Mary Ellen—scenes we need the curtains for

Cinema, Night Club, "backstage" of charity concert, bedroom w/just door showing, dressing room.

Casa Rosada drop, needs reweighted, elongated, and stabilized, also needs magnets in door, the middle chain needs to be shortened. 

Casa Rosada drop needs more dimension, it isn't as grand as the rest of set

 Bed needs to be shortened still

Cliff/Ron, masking for the wings?  Can't use the triangles, one and two will get caught in them?

Fold over the SL leg masking

can you check the stair treads?  The screws are breaking so the actual tread is weeble wobbly

Escape stairs SR

Thicker black on the SR wings side

Need luan/skin around the circle platforms

The paint is looking very brown under lights

Need the real rails for stairs. 

Didn't get the floor painted tonight, Mary Ellen and Cliff will tomorrow night

Props

Truncheons, bags for heavies, coins for bar , more luggage for nick and sam

Sounds/Lights/Special FX

Can you teach me/Robin how to start up/shut down projector

RON, we need six new mics, 4 ASAP, two by performance.

We have one and a half cases of batteries may need to order soonish. 

Costumes

Che needs a Beret,

Need to press military pants

Dance

Director

Music

Parents

Actors

Great job all, things worked really well, and we'll figure out the rest.

Crew

Thank you crew, things are getting a lot better.

Accident/Incident

Actor was hit with mic stand gash below knee.

Actor hit head on bracing

Child pushed into set, scratched leg

Actor hit head on juliet

Quote(s)

 



 


No comments:

Post a Comment